Author name: JohnHawes

Chief Operating Officer at AMTSO - email john.hawes@amtso.org

First Look – Testing Standard Draft 7.0

Since the approval of v6.1 of our Draft Standard and the move to Public Pilot phase after our Beijing meeting, the SWG has continued to work on improving and adjusting our master Draft Standard to incorporate issues raised and discovered since Beijing.

AMTSO Member Meetings – a first-timer’s guide

AMTSO holds member meetings twice a year, with between 35-60 member representatives getting together to discuss the latest issues in testing and AMTSO’s work to improve things. This post details how our meetings operate, as a guide for those attending for the first time.

AMTSO Board Election Information 2018-03

All of AMTSO’s activities are overseen and guided by our Board of Directors. This post gives some background on how the Board operates, and details the upcoming Board elections.

Member site refresh 2018-02

Over the past few weeks we’ve developed and rolled out a refreshed look and feel for our member site.

Endorsement Working Group Update 2018-02

The Endorsement Working Group (EWG) was formed to develop the next stage of the AMTSO Standards, building on top of the Testing Protocol Standard currently in Draft (Public Pilot phase).

RTTL Review Update 2018-01

The RTTL Review Working Group (RTTL-WG) is tasked with investigating the potential for improvements to the RTTL system, including possible changes to the requirements and regulations of the RTTL.

Standards project update 2018-01

Since the Beijing meeting our Standards project has been moving into a new phase, the public pilot approved by membership.

Scroll to Top